BEFORE (from inside pit, facing deck)
BEFORE (from deck, facing pit)
AFTER (from deck)
Work Items:
- [X] Remove gate between deck and pit.
- [X] Build step down from deck to pit.
- [X] Replace fence between deck and pit with handrail (and stain it).
- [X] Clear and level out ground with gravel.
- [X] Put down weed-killer and weed-blocking paper.
- [X] Build perimeter box out of 4x6 landscape timbers.
- [X] Fill box 6" deep with play cedar chips.
- [X] Install climbing toys.
- [X] Install flooring (astroturf-covered plywood) underneath play toys to avoid slivers.
- [ ] Install lattice under deck rail to prevent toys and kids from going under the deck.
Ok...so I didn't quite finish everything just yet...but it was definitely playable for Kate's big party on Saturday. All the kids had a blast. They even got to use the extra scraps of astroturf as toboggans for improved sliding viscosity. Laurie will probably post some pics/vids of the party soon.
In other news, Michelle came home to visit from Germany. She informed me that I was working on refinishing the dining room table the last time she visited. I guess I should get on finishing that table now...
0 comments:
Post a Comment